Article 10. Project size, implementation location and demand for use of natural resources
Circular 86/2015/TT-BGTVT — Hướng dẫn chi tiết về lĩnh vực đầu tư và nội dung báo cáo nghiên cứu khả thi dự án đầu tư theo hình thức đối tác công tư thuộc lĩnh vực giao thông vận tải.
Contents of feasibility study reports
1. Scientific bases for determining investment size, technical grade of project works suitable to the use demand and regulations and standards promulgated by competent authorities; project investment phases and limitations on technical standards (if any).
2. Project implementation location: project location and scope (starting point, ending point and control points); main landmarks on the project implementation location.
3. Land use demand: the scope (boundary) of land use for project ground allocation; total land area occupied by the project (temporary occupation, permanent occupation), classification of land plots according to current land use purposes for use as a basis for determining compensations and ground clearance plans.
4. Natural resource use demand based on collection of data and assessment of natural resources in the project location; usability of natural resources as construction materials (reserves and quality) and feasibility of natural resource exploitation.
Article 10, Circular 86/2015/TT-BGTVT