Circular 16/2000/TT-BXD
Guiding the construction management of foreign investment activities and the management of foreign contractors undertaking the construction or consultancy on construction of projects in Vietnam
English translation (unofficial)
CIRCULAR No
CIRCULAR No. 16/2000/TT-BXD OF DECEMBER 11, 2000 GUIDING THE CONSTRUCTION MANAGEMENT OF FOREIGN INVESTMENT ACTIVITIES AND THE MANAGEMENT OF FOREIGN CONTRACTORS UNDERTAKING THE CONSTRUCTION OR CONSULTANCY ON CONSTRUCTION OF PROJECTS IN VIETNAM
In furtherance of Article 112 of Decree No. 24/2000/ND-CP of July 31, 2000 of the Government, prescribing the responsibility of the ministries and branches for guiding foreign investment activities in the field of management; Performing its function of State management over construction prescribed in Decree No. 15/CP of March 4, 1994 of the Government, the Ministry of Construction hereby guides the management of the construction of projects with foreign direct investment capital, the management of activities of the construction organizations and construction consulting organizations set up under the Law on Foreign Investment in Vietnam and the management of foreign contractors undertaking the construction and consultancy on construction of works in Vietnam as follows:
I. MANAGEMENT OF THE CONSTRUCTION OF FOREIGN- INVESTED WORKS
1. Evaluation of the planning, architecture of construction works:
1.1. Objects of evaluation:
1.1.1. Investment projects under the Law on Foreign Investment in Vietnam with constructions must all be evaluated in terms of their planning and options on the work architecture in the course of evaluating the investment projects.
1.1.2. For foreign investment projects which only require the "registration for granting of investment licenses", the construction planning must satisfy the conditions prescribed at Point 1.b, Article 105 of Decree No. 24/2000/ND-CP of July 31, 2000 of the Government (on the projects’ compatibility with the approved planning).
1.2. The evaluation contents:
1.2.1. The content of evaluating the construction planning covers the consideration of the compatibility of the preliminary design in the project dossiers with the planning certificate (for investment areas with detailed planning being already approved) or the written agreement on architecture and planning of the construction (for areas with detailed planning being not yet approved) according to the requirements prescribed at Point 4.2.5 of Article 42 of Chapter 4 of the Construction Standards, volume 1, promulgated together with Decision No. 682/BXD-CSXD of December 14, 1996 of the Minister of Construction.
1.2.2. The content of evaluating the scheme on work architecture covers the consideration of the compatibility of the preliminary design of the work in term of the option for the total ground arrangement, the spatial blocs complex, the architectures of the main frontages of the work, exterior decoration, the arrangement of landscapes with yards, gardens against the architecture, landscapes and environment in areas surrounding the work.
1.3. The dossiers to be submitted for evaluation of the work planning and architecture in the dossiers for project evaluation shall include:
1.3.1. The dossier of preliminary design of the work in conformity with the requirements stated in Clause I.A of Appendix 1 to the "Regulation on management of the quality of construction works", promulgated together with Decision No.17/2000/QD-BXD of August 2,2000 of the Minister of Construction.
1.3.2. The planning certificate or the written agreement on the work architecture and planning granted by the provincial/municipal Construction Services. Particularly for cases where works lie in industrial parks, export processing zones or hi-tech parks (hereinafter referred collectively to as industrial parks), the companies dealing in industrial park infrastructures shall extract the detailed planning of the construction land plot in the industrial parks on the basis of the detailed planning of the industrial parks, already approved in replacement of the planning certificate. The planning certificate or the written agreement on architecture and planning shall be made and granted according to set form.
1.4. Evaluating bodies:
1.4.1. The Ministry of Construction shall evaluate the planning and scheme of architecture of works of group A projects (excluding projects in industrial parks already with detailed planning).
1.4.2. The provincial/municipal Construction Services shall assist the provincial-level People’s Committees in evaluating the planning and scheme of architecture of works in group B project dossiers (excluding projects in industrial parks already with detailed planning).
1.4.3. The provincial-level industrial parks management boards shall evaluate the planning and architecture of works of investment projects in industrial parks already with detailed planning.
1.5. Evaluation of the planning and architecture for investment projects on industrial park infrastructure:
For the evaluation of investment projects on industrial park infrastructure, the evaluation of the planning and architecture means the evaluation of the design of the industrial park detailed planning submitted by the investors. According the provisions in Clause 3, Article 23 of Decree No. 36/CP of April 24, 1997, the Ministry of Construction shall be the body competent to evaluate and approve the industrial park detailed planning (except otherwise decided by the Prime Minister).
2. Evaluation of technical designs of works:
2.1. The content of technical design evaluation:
2.1.1. The legal status of the designing organization:
a/ For projects undertaken by Vietnamese designing and consulting organizations, the work designing and consulting organizations must have business registration for the designing services , granted by the Vietnamese State. For projects undertaken by foreign designing and consulting organizations, after being selected for the bid or winning the bid, the foreign designing and consulting organizations must make registration so as to be granted the permit to contract the construction consultancy as provided for in Section III of this Circular.
b/ The surveys in service of work designing (including topographical surveys, construction geological, hydro-geological and environmental surveys) must be carried out by Vietnamese surveying organizations with legal person status. Where the survey requires special techniques which cannot be performed by Vietnamese surveying organizations, the investors may select foreign surveying organizations for the job. Such foreign surveying organizations shall have to make registration at the Ministry of Construction so as to be granted the surveying permits.
2.1.2. The compatibility of the planning and architecture designs:
a/ Considering the compatibility in construction planning and architecture of the technical design with the project already evaluated when granting the investment license, the compatibility with the granted planning certificate or written agreement on architecture and planning. If the general ground planning and work architecture in the technical design see some changes as compared with the preliminary design, the contents of planning and architecture evaluation shall comply with the contents at Point 1.2 above.
b/ Where the technical infrastructures outside the work’s fences (to the outside of the land plot of the project) are neither available nor conformable with the work design, the investors shall have to draw up handling options and reach agreement with the specialized management bodies (according to the provisions in Article 103 of Decree No. 24/2000/ND-CP).
2.1.3. The compatibility of technical designs with the applicable standards and criteria:
a/ The work design shall be made according to construction standards and construction criteria of Vietnam. Where foreign standards shall be applied, such must be approved in writing by the Ministry of Construction.
b/ The evaluation of the observance of standards and criteria applicable to designing must be conducted for the written exposition of the design and drawings of the design dossiers, ensuring the conformity with the work grade, the conditions on work safety, fire and explosion prevention and fight safety and environmental protection.
2.2. Organizing the evaluation of technical designs:
2.2.1. Division of responsibility for design evaluation:
a/ The Ministry of Construction shall evaluate the technical designs of constructions under group A projects, excluding group A projects of small-size construction and installation( valued at below 10% of the total investment amount but not more than 10 million USD) and investment projects in forms of construction-operation- transfer (BOT) contracts, construction- transfer- operation (BTO) contracts and construction- transfer (BT) contracts.
b/ The Construction Services of the provinces and centrally-run cities shall organize the evaluation of technical designs of constructions under group B projects and group A projects of small construction and installation scale mentioned at Point a above, and submit them to the provincial-level People’s Committees for decision and approval of the designs (except BOT, BTO and BT projects).
c/ The State bodies competent to sign BOT, BTO or BT contracts shall assume the prime responsibility and coordinate with the Ministry of Construction, ministries managing specialized construction, the People’s Committees of the provinces and centrally-run cities with projects in evaluating the technical designs of works under the BOT, BTO and BT contracts.
2.2.2. Dossiers to be submitted for evaluation of technical designs:
The investors shall directly submit to the evaluating bodies (assigned at Point 2.2.1 above) 4 sets of design dossiers, each including:
a/ The application for design evaluation and for the permission to build the work (signed and stamped by the investor).
b/ Documents determining the legal person status of the work designing organization according to the provisions in Item 2.1.1 above).
c/ The conclusion on the evaluation of the work architecture planning and option in the period of evaluation for the granting of investment license.
d/ The technical design documents, including:
d.1. The general exposition of the work design, attached with data on climatic, geological, environmental surveys, other data related to design and the list of foreign standards used for designing, which have been approved by the Ministry of Construction, the list of software program used for designing the work;
d.2. The conclusion of the design inspection consulting organization (if any);
d.3. The drawings on the general ground and the general drawing on arrangement of technological chains;
d.4. The drawings on the overall work architecture, including: drawings on the ground, vertical sections, cross section of the work, drawings on main structures of foundation and body of the work;
d.5. Drawings on the general technical infrastructure system of the work and maps of connection to the common technical infrastructure work;
d.6. The planning certificate or written agreement on architecture and construction planning;
d.7. Valid copies of the decision on land lease or land lease contract or the land use right certificate, attached with extracts of land administration maps of 1/200-1/500 scale;
d.8. The copies of the investment license and written approvals of State management bodies for environment, fire and explosion prevention and fight;
d.9. The list of volume and criteria of special building materials of the project (according to design) which need to be imported into Vietnam.
2.2.3. When evaluating designs related to other specialized construction, the design evaluating body shall have to invite the ministry or provincial/municipal Service managing the specialized construction (and the industrial park management board if the work lies in the industrial park) to participate in the evaluation and making report according to set form.
The design evaluation results shall be the written decision to approve the technical designs and work construction, made according to set form by the evaluating body.
2.2.4. The already evaluated design dossiers must be stamped with the seals of competent bodies and assigned to the investor with two sets; one set shall be kept at the evaluating body, and one set shall be handed over to the local Construction Service (or the industrial parks management board if the project lies in the industrial park) for monitoring the implementation.
2.2.5. The time limit for evaluating the technical design of the entire work or according to each designing stage shall be 20 working days after the receipt of complete and valid dossiers. For incomplete dossiers as prescribed above, within 5 working days after the receipt of the dossiers, the evaluating body shall request the investor in writing to supplement the dossiers and the time for evaluating the design shall be prolonged correspondingly to the time needed for the supplement of the design.
2.2.6. The investors shall pay design evaluation fees to the evaluating bodies according to the regulations of the Finance Ministry.
2.2.7. If 12 months after the receipt of the decision on design evaluation and work construction the project still fails to get off the ground, such written decision shall no longer have effect for implementation. If needing to continue the work construction, the investor shall have to explain the reasons therefor in writing so that the evaluating body shall consider and permit the continued implementation or make re-evaluation. In the course of construction, the change in architecture, planning, main structures of the work as compared to the already evaluated designs shall be made only after it is approved by the design evaluating body.
2.2.8. The design evaluating bodies shall take responsibility before the State and law of Vietnam for their evaluation and decisions.
2.3. Deployment of the work construction
After receiving the decisions on design evaluation and work construction, issued by the evaluating bodies, the investors may proceed with the construction of the work according to the evaluated designs; or if past the time limit of 20 working days after submitting their dossiers of application for design evaluation (based on the dossiers receiving sheets), the design evaluating body still fails to notify its decision, the investor shall be entitled to proceed with the project construction according to the design dossiers already submitted. The investor shall have to notify the time of construction commencement 10 days in advance to the design evaluating body and the local administration (and the industrial parks management board if the work lies in the industrial park).
3. Examination of the performance of bidding in construction
Bodies competent to grant permits to contract the construction and construction consultancy shall examine the performance of bidding in construction when considering the granting of permits to foreign contractors under the provisions in Clause 3, Article 94 of Decree No. 24/2000/ND-CP of July 31, 2000 of the Government, including the following contents:
3.1. The legitimacy of the foreign legal person registered for the performance of the construction as compared with the document certifying the bidding results of the competent body under the Bidding Regulation.
3.2. The fulfillment of commitments by contractors according to bid evaluation results and the provisions of the Bidding Regulation.
4. Management of the quality of construction works:
4.1.1. The investors take responsibility before Vietnamese law for ensuring the quality of the work construction, safety and stability, fire and explosion prevention and fighting, environmental protection in the process of work construction as well as throughout the period of using the works.
4.1.2. The surveying or designing organizations, the construction contractors shall be responsible before the investors and Vietnamese law for their respective work and products relating to the work quality.
4.2. The quality of foreign-invested construction works (including works in industrial parks, works under BOT, BTO or BT contracts) shall be managed according to the provisions in Chapters 1,3,4 and 5 of the Regulation on Management of the Quality of Construction Works, promulgated together with Decision No.17/2000/QD-BXD of August 2,2000 of the Construction Minister, except for the contents relating to the State Council for Pre-acceptance Tests mentioned at Clause 3, Article 19 of such Regulation. Particularly for construction works under BOT, BTO and BT contracts, the State bodies competent to sign BOT, BTO or BT contracts shall have to organize their professional sections for participation in supervising the construction, pre-acceptance test of the work quality in the process of construction and pre-acceptance test upon the construction completion and work commissioning.
4.3. Upon the completion of the work construction (already tested before acceptance and putting the completed work to use), the investors shall report such to the competent design evaluating bodies (provided for at Point 2.2.1 above). The report shall be made according to set form. After making such reports, the investors may put the works to use. The investors shall have to fully bear the responsibility for the contents of the reports. In case of necessity, the bodies competent to evaluate the designs shall proceed with the inspection of the works; if any violation of the already evaluated designs or the provisions on construction is detected, the violator shall be handled according to law.
4.4. Within 6 months after the completion of work and the commissioning of the entire work, the investors shall have to submit dossiers on the completion of the work construction according to the State’s regulations on archiving documents and materials.
II. MANAGEMENT OF ACTIVITIES OF CONSTRUCTION AND CONSTRUCTION CONSULTANCY ENTERPRISES SET UP UNDER THE LAW ON FOREIGN INVESTMENT IN VIETNAM
After being granted the investment licenses, the construction and construction consultancy enterprises should ensure the business conditions according to law provisions as follows:
1. Enterprises operating in the field of construction, when conducting business activities in Vietnam, must fully meet the "construction business conditions" promulgated together with Decision No. 27/2000/QD-BXD of December 8, 2000 of the Construction Minister and abide by other law provisions relating to construction.
2. For construction consultancy enterprises conducting activity of designing construction works, one of the representatives of the legal person enterprise and the enterprise’s persons assuming the prime responsibility in design shall have to make registration at competent bodies so as to be granted the certificate of work designing practice according to the law provisions in "Regulation on granting certificates of work designing practice", promulgated together with Decision No. 23/2000/QD-BXD of November 13,2000 of the Construction Minister.
III. MANAGEMENT OF FOREIGN CONTRACTORS WHO ENTER TO CONTRACT THE CONSTRUCTION CONSULTANCY OR WORK CONSTRUCTION IN VIETNAM
Foreign contractors who enter Vietnam to contract the construction consultancy or project construction after winning bids or being selected as winning bidder under Vietnam’s Bidding Regulation, legislation on foreign investment in Vietnam or under the international agreements signed by the Vietnamese State, when conducting activities, shall have to follow the guidance in this Circular (except otherwise provided for by the Government or the international agreements which the Vietnamese State has signed):
1. General provisions
1.1. Foreign contractors, including construction consultancy contractors (including consultancy on management of construction project, survey, designs, examination of designs, inspection, management of construction quality and other construction consulting jobs) and the work construction contractors (hereinafter referred collectively to as contractors), when contracting to implement construction projects in Vietnam, shall all have to compile dossiers according to the guidance in this Circular so as to be granted permits for contracting the construction consultancy or project construction.
1.2. The permit for contracting the construction consultancy, the permit for contracting the work construction (called collectively the contracting permits) shall have granted to foreign contractors according to each contract. For the second contract on, if arising in the same year, the procedures to apply for the permits shall require only the application and other supplementary documents as compared with the dossiers submitted previously.
1.3. The contracting permits granted to foreign contractors shall serve as legal certificates for foreign contractors to perform the contracts on construction consultancy, for work construction and installation in Vietnam, and to contact Vietnamese State bodies in implementing relevant law provisions in Vietnam.
1.4. Upon receiving the contracting permits, foreign contractors shall have to pay fees according to the regulations of the Finance Ministry.
2. Dossiers of applying for contracting permits for construction to be submitted by foreign contractors shall include 1 set of originals and 3 sets of copies; the set of originals include:
2.1. The application for contracting permit for work construction (made according to set form)
2.2. Copies of the reports on bidding process, bid evaluation and bidding results, made by investors and documents certifying the bidding results, issued by competent bodies or the investors’ decisions on lawful selection of bidders.
2.3. Copies of project investment licenses granted by competent bodies or investment decisions for State-funded projects or construction permits for projects not financed by the State.
2.4. Certificates of foreign contractors’ legal person status: The founding permit and the company’s charter (or business registration paper) and professional practice certificates granted to contractors by their home countries (copies notarized in the host countries or certified by competent diplomatic missions of Vietnam or the host countries).
2.5. The contracts on joint ventures with Vietnamese contractors or written commitment to use Vietnamese subcontractors as provided for in the Regulation on Bidding of Vietnam.
3. The dossiers of application for permits to contract for construction consultancy submitted by foreign contractors with 01 set of originals and 03 sets of copies. The set of originals includes:
3.1. The application for the permit to contract for construction consultancy (according to set form).
3.2. The copies of the investor’s report on bidding evaluation and results; the competent body’s written certification of the bidding results; or the investor’s decision on selection of bidder.
3.3. The copies of project investment license granted by competent body or investment decision for State-funded projects or construction permit for projects not financed by the State.
3.4. The foreign contractor’s legal person status certificate of construction consultancy granted in the host country (notarized copy); the declaration of working experiences in work designing.
4. Organizations to grant contracting permits:
4.1. The Construction Ministry shall consider and grant contracting permits to foreign contractors who execute construction and installation bidding packages of group A projects with value of USD 10 million or more and construction consultancy bidding packages with value of USD 1 million or more (works with foreign investment capital or works with domestic investment capital); and to cases not falling under the provincial/municipal Construction Services’ competence to grant contracting permits as prescribed at Point 4.2 below.
4.2. The provincial/municipal Construction Services shall grant contracting permits to foreign contractors who execute bidding packages of group B projects (works with foreign investment capital) and group B-C projects (works with domestic investment capital) in the provinces and small bidding packages of group A projects, with value lower than the levels prescribed at Point 4.1 above.
4.3. Within 5 working days after the receipt of dossier of application for contracting permit, if deeming that the dossier is incomplete or invalid, the permit-granting body shall request the contractor to supplement the documents. The consideration and granting of permits to foreign contractors shall be effected within 20 working days after the receipt of valid dossiers.
The contracting permits for construction and construction consultancy granted to foreign contractors shall be made according to set form.
5. Things to be done by foreign contractors after being granted the contracting permits:
5.1. Registering the transaction addresses, telephone numbers and fax numbers in Vietnam and their lawful representatives with the People’s Committees of the provinces or cities where exist the works and notifying the Construction Ministry and local Construction Services (and the industrial park management boards if the works lie in the industrial parks) thereof. Re-registering any change, if any, and making notification as prescribed above.
5.2. Strictly abiding by the provisions of Vietnamese laws on investment and construction management.
5.3. Observing the provisions in the contracting permits, abiding by other Vietnamese legislation related to contracting activities in Vietnam.
5.4. Reporting once every six months and upon the contract termination on activities under the granted contracting permits to the Construction Ministry and provincial/municipal Construction Services (according to set form).
IV. ORGANIZATION OF INSPECTION AND IMPLEMENTATION
1. Organization of inspection:
1.1. Basing themselves on the division of responsibility in this Circular, the Construction Ministry and the provincial/municipal Construction Services shall organize the inspection of the construction of foreign-invested works, the operation of foreign-invested enterprises dealing in construction and construction consultancy and the annual inspection of the activities of foreign contractors. When conducting the investigation, they must notify the investment licensing bodies thereof for coordination.
The extraordinary inspection shall be conducted when a contractor is detected with signs of violating the legislation on construction, when there are complaints of parties involved in the work construction or when occur project incidents; the inspecting bodies must conduct the inspection and handle the cases strictly according to the procedures prescribed by law.
The investors and the contractors shall have to create favorable conditions for the inspecting bodies to well perform their function.
1.2. All activities of arbitrary investigation in contravention of the provisions at Point 1.1 above, which cause troubles to the process of work construction are strictly forbidden. All acts of abusing one’s inspecting powers to cause troubles to investors and contractors shall be strictly handled according to law.
1.3. Within 10 days after the inspection, the inspecting bodies shall have to make reports thereon and send them to the Construction Minister, the Minister of Planning and Investment and the presidents of the People’s Committees of the provinces (where exist the works) for awareness and handling when necessary.
1.4. Once every six months, the provincial/municipal Construction Services shall report to the Construction Ministry on the granting of contracting permits for construction, the situation on the construction of foreign-invested works in their localities.
2. Organization of implementation:
2.1. This Circular takes effect 15 days after its signing for promulgation and replaces Circular No. 01/BXD-CSXD of April 15, 1997, Circular No. 03/1998/TT-BXD of June 12, 1998 of the Construction Ministry guiding the management of the construction of projects with foreign direct investment capital, undertaken for construction in Vietnam by foreign contractors and replaces Circular No. 02/1998/TT-BXD of April 29, 1998 of the Construction Ministry guiding the operation registration by enterprises involved in construction or construction consultancy with foreign direct investment capital in Vietnam.
2.2. The competent State bodies shall organize the implementation according to the provisions in this Circular. If in the course of implementation problems arise or new matters are detected, they shall be reported to the Construction Ministry for timely study and solution.
Construction Minister
NGUYEN MANH KIEM
7 parts
Bộ Xây dựng
Số: 16/2000/TT-BXD
ngày 11 tháng 12 năm 2000
THÔNG TƯ
Hướng dẫn việc quản lý xây dựng đối với hoạt động đầu tư nước ngoài
và quản lý các nhà thầu nước ngoài vào nhận thầu xây dựng và tư vấn
xây dựng công trình tại Việt Nam
Thực hiện Điều 112 của Nghị định số 24/2000/NĐ-CP ngày 31-7-2000 của Chính phủ qui định các Bộ, ngành có trách nhiệm hướng dẫn hoạt động đầu tư nước ngoài trong lĩnh vực quản lý; Thực hiện chức năng quản lý nhà nước về xây dựng của Bộ Xây dựng qui định tại Nghị định số 15/CP ngày 04-3-1994 của Chính phủ. Bộ Xây dựng hướng dẫn việc quản lý xây dựng các công trình có vốn đầu tư trực tiếp của nước ngoài, quản lý hoạt động của các tổ chức xây dựng và tư vấn xây dựng được thành lập theo Luật Đầu tư nước ngoài taị Việt Nam và quản lý các nhà thầu nước ngoài vào nhận thầu xây dựng và tư vấn xây dựng công trình tại Việt Nam như sau:
-
Mục I › 1
1. Thẩm định về qui hoạch, kiến trúc công trình xây dựng: 1.1. Đối tượng thẩm định: 1.1.1. Các dự án đầu tư theo Luật đầu tư nước ngoài tại Việt Nam có công trình xây dựng đều phải được thẩm định về qui hoạch và phương án kiến trúc công trình trong quá trình thẩm định dự án đầu tư. 1.1.2. Đối với dự án đầu tư nước ngoài thuộc diện chỉ cần "Đăng ký cấp giấy phép đầu tư" thì về qui hoạch công trình phải thoả mãn điều kiện qui định tại điểm 1.b Điều 105 của Nghị định số 24/2000/NĐ-CP ngày 31-7-2000 của Chính phủ (về việc dự án phù hợp với qui hoạch đã được duyệt). 1.2. Nội dung thẩm định: 1.2.1. Nội dung thẩm định về qui hoạch công trình là xem xét sự phù hợp của thiết kế sơ bộ trong hồ sơ dự án so với chứng chỉ qui hoạch (đối với khu vực đầu tư đã có qui hoạch chi tiết được duyệt) hoặc văn bản thoả thuận về kiến trúc và qui hoạch công trình (đối với khu vực chưa có qui hoạch chi tiết được duyệt) theo các yêu cầu được qui định tại điểm 4.2.5 Điều 42 chương 4 của Qui chuẩn xây dựng tập 1 được ban hành theo Quyết định số 682/BXD-CSXD ngày 14-12-1996 của Bộ trưởng Bộ Xây dựng. 1.2.2. Nội dung thẩm định về phương án kiến trúc công trình là xem xét sự phù hợp của thiết kế sơ bộ công trình về phương án bố trí tổng mặt bằng, tổ hợp hình khối không gian, kiến trúc các mặt chính công trình, trang trí ngoại thất, bố trí cảnh quan sân vườn so với kiến trúc, cảnh quan và môi trường khu vực xung quanh nơi có công trình. 1.3. Hồ sơ trình thẩm định qui hoạch, kiến trúc công trình có trong hồ sơ trình thẩm định dự án, bao gồm: 1.3.1. Hồ sơ thiết kế sơ bộ công trình phù hợp với yêu cầu nêu tại khoản I.A của phụ lục số 1 thuộc "Qui định quản lý chất lượng công trình xây dựng" được ban hành kèm theo Quyết định số 17/2000/QĐ-BXD ngày 02-8-2000 của Bộ trưởng Bộ Xây dựng. 1.3.2. Bản chứng chỉ qui hoạch hoặc bản thoả thuận về kiến trúc và qui hoạch công trình do Sở Xây dựng địa phương cấp. Riêng đối với trường hợp công trình nằm trong khu công nghiệp, khu chế xuất hoặc khu công nghệ cao (sau đây gọi chung là KCN) thì công ty kinh doanh cơ sở hạ tầng KCN trích sao qui hoạch chi tiết lô đất xây dựng trong KCN trên cơ sở qui hoạch chi tiết KCN đã được duyệt thay thế cho bản chứng chỉ qui hoạch. Bản chứng chỉ qui hoạch hoặc bản thoả thuận về kiến trúc và qui hoạch được xin và cấp theo mẫu tại phụ lục số 1. 1.4. Cơ quan thẩm định: 1.4.1. Bộ Xây dựng thẩm định về qui hoạch và phương án kiến trúc công trình của dự án nhóm A (trừ dự án trong KCN đã có qui hoạch chi tiết). 1.4.2. Sở Xây dựng giúp Uỷ ban nhân dân cấp tỉnh thẩm định qui hoạch và phương án kiến trúc công trình trong hồ sơ dự án nhóm B (trừ dự án trong KCN đã có qui hoạch chi tiết). 1.4.3. Ban quản lý KCN cấp tỉnh thẩm định về qui hoạch và kiến trúc công trình của dự án đầu tư trong KCN đã có qui hoạch chi tiết. 1.5. Thẩm định về qui hoạch và kiến trúc đối với dự án đầu tư cơ sở hạ tầng KCN: Khi thẩm định dự án đầu tư cơ sở hạ tầng KCN, việc thẩm định về qui hoạch, kiến trúc là việc thẩm định đối với bản thiết kế qui hoạch chi tiết KCN do chủ đầu tư trình. Theo qui định tại khoản 3 Điều 23 của Nghị định số 36/CP ngày 24-4-1997, Bộ Xây dựng là cơ quan có thẩm quyền thẩm định và phê duyệt qui hoạch chi tiết KCN (trừ trường hợp có quyết định khác của Thủ tướng Chính phủ).
-
Mục I › 2
2. Thẩm định thiết kế kỹ thuật công trình: 2.1. Nội dung thẩm định thiết kế kỹ thuật: 2.1.1. Tư cách pháp lý của tổ chức thiết kế: a) Đối với dự án do tổ chức tư vấn thiết kế Việt Nam thực hiện thì tổ chức tư vấn, thiết kế công trình phải có đăng ký kinh doanh, dịch vụ thiết kế do Nhà nước Việt Nam cấp. Đối với dự án do tổ chức tư vấn, thiết kế nước ngoài thực hiện thì sau khi được chọn thầu hoặc trúng thầu, tổ chức tư vấn, thiết kế nước ngoài phải đăng ký để được cấp giấy phép thầu tư vấn xây dựng theo qui định tại phần III của Thông tư này. b) Việc khảo sát phục vụ thiết kế công trình (bao gồm khảo sát địa hình, khảo sát địa chất công trình, địa chất thuỷ văn và môi trường) phải do tổ chức khảo sát có tư cách pháp nhân Việt Nam thực hiện. Trường hợp khảo sát có yêu cầu kỹ thuật đặc biệt mà các tổ chức khảo sát Việt Nam không có khả năng thực hiện thì chủ đầu tư được chọn tổ chức khảo sát nước ngoài thực hiện. Tổ chức khảo sát nước ngoài này phải đăng ký để được cấp giấy phép khảo sát tại Bộ Xây dựng. 2.1.2. Sự phù hợp của bản thiết kế về qui hoạch và kiến trúc: a) Xem xét sự phù hợp về qui hoạch và kiến trúc công trình của thiết kế kỹ thuật so với dự án đã được thẩm định khi cấp giấy phép đầu tư, phù hợp với chứng chỉ qui hoạch hoặc bản thoả thuận về kiến trúc và qui hoạch được cấp. Nếu qui hoạch tổng mặt bằng và kiến trúc công trình trong thiết kế kỹ thuật có sự thay đổi so với thiết kế sơ bộ thì nội dung thẩm định qui hoạch và kiến trúc sẽ thực hiện theo nội dung tại điểm 1.2 trên đây.b) Trường hợp cơ sở kỹ thuật hạ tầng tới ngoài hàng rào công trình (tới bên ngoài lô đất của dự án) mà chưa có hoặc không phù hợp với thiết kế công trình thì chủ đầu tư cần có phương án xử lý và có thoả thuận với cơ quan quản lý chuyên ngành (theo qui định tại Điều 103 của Nghị định số 24/2000/NĐ-CP). 2.1.3. Sự phù hợp của thiết kế kỹ thuật với qui chuẩn, tiêu chuẩn được áp dụng:a) Thiết kế công trình được thực hiện theo Qui chuẩn xây dựng, tiêu chuẩn xây dựng của Việt Nam. Trường hợp áp dụng tiêu chuẩn nước ngoài phải được Bộ Xây dựng chấp thuận bằng văn bản.b) Việc thẩm định về sự tuân thủ các qui chuẩn, tiêu chuẩn áp dụng để thiết kế được thực hiện đối với nội dung bản thuyết minh thiết kế và các bản vẽ của hồ sơ thiết kế bảo đảm được sự phù hợp với cấp công trình, điều kiện về an toàn công trình, an toàn phòng chống cháy nổ và bảo vệ môi trường. 2.2. Tổ chức thẩm định thiết kế kỹ thuật: 2.2.1. Phân cấp thẩm định thiết kế:a) Bộ Xây dựng thẩm định thiết kế kỹ thuật công trình xây dựng thuộc các dự án nhóm A, trừ dự án nhóm A qui mô xây lắp nhỏ (có giá trị xây lắp nhỏ hơn 10% so với tổng mức đầu tư nhưng không lớn hơn 10 triệu USD) và trừ các dự án đầu tư theo hình thức hợp đồng xây dựng - kinh doanh - chuyển giao BOT, hợp đồng xây dựng - chuyển giao - kinh doanh BTO, hợp đồng xây dựng - chuyển giao BT.b) Sở Xây dựng các tỉnh và thành phố trực thuộc trung ương tổ chức thẩm định thiết kế kỹ thuật công trình xây dựng thuộc dự án nhóm B và dự án nhóm A qui mô xây lắp nhỏ nói tại điểm a trên đây và trình Uỷ ban nhân dân cấp tỉnh quyết định chấp thuận thiết kế (trừ dự án BOT, BTO, BT).c) Cơ quan Nhà nước có thẩm quyền ký kết hợp đồng BOT, BTO, BT chủ trì, phối hợp với Bộ Xây dựng, Bộ có quản lý xây dựng chuyên ngành, Uỷ ban nhân dân tỉnh và thành phố trực thuộc trung ương có dự án để thẩm định thiết kế kỹ thuật các công trình thuộc hợp đồng BOT, BTO, BT. 2.2.2. Hồ sơ trình thẩm định thiết kế kỹ thuật: Chủ đầu tư nộp trực tiếp cho cơ quan thẩm định (được phân cấp tại điểm 2.2.1 trên đây) 04 bộ hồ sơ thiết kế, mỗi bộ gồm:a) Đơn đề nghị thẩm định thiết kế và xin phép xây dựng công trình (do chủ đầu tư đứng tên ký và đóng dấu) theo mẫu tại phụ lục số 2 của Thông tư này.b) Các văn bản xác định tư cách pháp lý của tổ chức thiết kế công trình theo qui định tại mục 2.1.1 trên đây.c) Kết luận thẩm định qui hoạch và phương án kiến trúc công trình trong giai đoạn thẩm định cấp giấy phép đầu tư.d) Các tài liệu thiết kế kỹ thuật gồm có: d.1) Bản thuyết minh tổng hợp thiết kế công trình có kèm theo các số liệu khảo sát về khí hậu, địa chất công trình, môi trường, các số liệu khác liên quan đến thiết kế và bản kê các tiêu chuẩn nước ngoài dùng để thiết kế đã được Bộ Xây dựng chấp thuận, bản kê chương trình phần mềm dùng để thiết kế công trình; d.2) Bản kết luận của tổ chức tư vấn thẩm tra thiết kế (nếu có); d.3) Các bản vẽ tổng mặt bằng và bản vẽ tổng hợp bố trí dây chuyền công nghệ; d.4) Các bản vẽ kiến trúc tổng thể công trình gồm: các bản vẽ mặt bằng, mặt đứng, mặt cắt công trình, các bản vẽ kết cấu chính về nền móng và thân công trình; d.5) Các bản vẽ tổng hợp hệ thống kỹ thuật hạ tầng công trình và sơ đồ đấu nối vào các công trình kỹ thuật hạ tầng chung; d.6) Chứng chỉ qui hoạch hoặc bản thoả thuận về kiến trúc và qui hoạch xây dựng. d.7) Bản sao hợp pháp quyết định cho thuê đất hoặc hợp đồng thuê đất hoặc giấy chứng nhận quyền sử dụng đất kèm theo trích lục bản đồ địa chính 1/200 á 1/500; d.8) Bản sao giấy phép đầu tư và các văn bản thoả thuận của cơ quan quản lý nhà nước về môi trường và phòng chống cháy, nổ; d.9) Bảng liệt kê khối lượng và tiêu chuẩn các vật liệu xây dựng đặc biệt của dự án (theo thiết kế) có nhu cầu nhập khẩu vào Việt Nam. 2.2.3. Khi thẩm định thiết kế có liên quan đến chuyên ngành xây dựng khác, cơ quan thẩm định thiết kế phải mời Bộ hoặc Sở quản lý xây dựng chuyên ngành (và Ban quản lý KCN nếu công trình nằm trong KCN) tham gia thẩm định và lập báo cáo theo mẫu 1 tại phụ lục số 3 của Thông tư này. Kết quả thẩm định thiết kế là văn bản quyết định chấp thuận thiết kế kỹ thuật và xây dựng công trình do cơ quan thẩm định ban hành theo mẫu 2 tại phụ lục số 3 của Thông tư này. 2.2.4. Hồ sơ thiết kế đã qua thẩm định phải được đóng dấu của cơ quan thẩm định và được giao lại cho chủ đầu tư hai bộ, lưu tại cơ quan thẩm định một bộ, giao cho Sở Xây dựng địa phương (hoặc Ban quản lý KCN nếu công trình nằm trong KCN) một bộ để theo dõi thực hiện. 2.2.5. Thời hạn thẩm định thiết kế kỹ thuật toàn công trình hoặc theo từng giai đoạn thiết kế là 20 ngày làm việc kể từ ngày nhận đủ hồ sơ hợp lệ. Đối với hồ sơ nộp không đầy đủ theo qui định trên, trong thời hạn 5 ngày làm việc sau khi nhận hồ sơ cơ quan thẩm định cần có văn bản yêu cầu chủ đầu tư bổ sung hồ sơ cho đầy đủ và thời gian thẩm định thiết kế được kéo dài tương ứng với thời gian bổ sung thiết kế. 2.2.6. Chủ đầu tư nộp lệ phí thẩm định thiết kế cho cơ quan thẩm định theo qui định của Bộ Tài chính. 2.2.7. Sau 12 tháng kể từ khi nhận được quyết định về thẩm định thiết kế và xây dựng công trình mà công trình vẫn chưa được tiến hành xây dựng thì văn bản quyết định đó không còn hiệu lực thi hành. Nếu cần tiếp tục xây dựng công trình, chủ đầu tư trình bày lý do bằng văn bản để cơ quan thẩm định xem xét cho tiếp tục thực hiện hoặc thẩm định lại. Trong quá trình xây dựng, sự thay đổi về kiến trúc, qui hoạch, kết cấu chính của công trình so với thiết kế đã được thẩm định chỉ được thực hiện sau khi có sự chấp thuận của cơ quan thẩm định thiết kế. 2.2.8. Cơ quan thẩm định thiết kế chịu trách nhiệm trước Nhà nước và pháp luật Việt Nam về việc thẩm định và quyết định của mình. 2.3. Triển khai xây dựng công trình. Sau khi nhận được quyết định về thẩm định thiết kế và xây dựng công trình của cơ quan thẩm định thì chủ đầu tư được tiến hành xây dựng công trình theo thiết kế đã được thẩm định; hoặc quá thời hạn 20 ngày làm việc kể từ ngày nộp đủ hồ sơ xin thẩm định thiết kế (căn cứ vào bản ký nhận hồ sơ) mà cơ quan thẩm định thiết kế không thông báo quyết định của mình thì chủ đầu tư được tiến hành xây dựng công trình theo hồ sơ thiết kế đã nộp. Chủ đầu tư phải thông báo thời điểm khởi công xây dựng trước 10 ngày cho cơ quan thẩm định thiết kế và chính quyền địa phương (và Ban quản lý KCN nếu công trình nằm trong KCN).
-
Mục I › 3
3. Kiểm tra việc thực hiện đấu thầu trong xây dựng Cơ quan có thẩm quyền cấp giấy phép thầu xây dựng và tư vấn xây dựng kiểm tra việc thực hiện đấu thầu trong xây dựng khi xét cấp giấy phép thầu cho nhà thầu nước ngoài theo qui định tại khoản 3-Điều 94 của Nghị định số 24/2000/NĐ-CP ngày 31-7-2000 của Chính phủ bao gồm các nội dung sau: 3.1. Tính hợp lệ của pháp nhân nước ngoài đăng ký thực hiện xây dựng so với văn bản xác nhận kết quả đấu thầu của cơ quan có thẩm quyền theo Quy chế Đấu thầu. 3.2. Việc thực hiện cam kết của nhà thầu theo kết quả xét thầu và qui định của Quy chế đấu thầu.
-
Mục I › 4
4. Quản lý chất lượng công trình xây dựng 4.1. Trách nhiệm đảm bảo chất lượng công trình xây dựng: 4.1.1. Chủ đầu tư chịu trách nhiệm trước pháp luật Việt Nam về việc đảm bảo chất lượng xây dựng công trình, an toàn và ổn định công trình, phòng chống cháy, nổ, bảo vệ môi trường trong thời kỳ xây dựng công trình cũng như trong suốt thời gian sử dụng công trình. 4.1.2. Tổ chức khảo sát, thiết kế, nhà thầu xây dựng chịu trách nhiệm trước chủ đầu tư và pháp luật Việt Nam về phần công việc và sản phẩm của mình liên quan đến chất lượng công trình. 4.2. Chất lượng công trình xây dựng có vốn đầu tư nước ngoài (kể cả đối với công trình trong KCN, công trình thuộc hợp đồng BOT, BTO, BT) được quản lý và thực hiện theo qui định tại chương 1, 3, 4 và 5 của bản Qui chế Quản lý chất lượng công trình xây dựng được ban hành kèm theo Quyết định số 17/2000/QĐ-BXD ngày 02-8-2000 của Bộ trưởng Bộ Xây dựng trừ nội dung liên quan đến Hội đồng nghiệm thu Nhà nước nêu tại khoản 3 Điều 19 của bản Qui định đó. Riêng đối với công trình xây dựng thuộc hợp đồng BOT, BTO, BT cơ quan Nhà nước có thẩm quyền ký hợp đồng BOT, BTO, BT phải tổ chức bộ phận chuyên môn của mình tham gia giám sát việc thi công, nghiệm thu chất lượng công trình trong quá trình xây dựng và nghiệm thu hoàn thành xây dựng đưa công trình vào sử dụng. 4.3. Khi kết thúc xây dựng công trình(đã tổ chức nghiệm thu đưa công trình hoàn thành vào sử dụng), nhà đầu tư báo cáo cơ quan có thẩm quyền thẩm định thiết kế (được qui định tại điểm 2.2.1 trên đây). Báo cáo được lập theo mẫu qui định tại phụ lục số 4 của Thông tư này. Sau khi thực hiện việc báo cáo đó, nhà đầu tư được phép đưa công trình vào sử dụng. Nhà đầu tư phải hoàn toàn chịu trách nhiệm về nội dung mình báo cáo. Trường hợp cần thiết cơ quan có thẩm quyền thẩm định thiết kế tiến hành kiểm tra công trình; nếu phát hiện có vi phạm thiết kế đã được thẩm định hoặc các qui định về xây dựng sẽ bị xử lý theo qui định của pháp luật. 4.4. Trong thời hạn 6 tháng kể từ ngày hoàn thành xây dựng, đưa toàn bộ công trình vào sử dụng, chủ đầu tư phải nộp hồ sơ hoàn thành xây dựng công trình theo qui định của Nhà nước về lưu trữ hồ sơ tài liệu.
-
Section II
QUẢN LÝ HOẠT ĐỘNG CỦA DOANH NGHIỆP XÂY DỰNG VÀ TƯ VẤN XÂY DỰNG ĐƯỢC THÀNH LẬP THEO LUẬT ĐẦU TƯ NƯỚC NGOÀI TẠI VIỆT NAM
Sau khi được cấp giấy phép đầu tư, doanh nghiệp xây dựng và tư vấn xây dựng cần bảo đảm các điều kiện kinh doanh theo qui định của pháp luật như sau:
1. Doanh nghiệp hoạt động trong lĩnh vực xây dựng khi hoạt động kinh doanh tại Việt Nam phải bảo đảm có đầy đủ "Điều kiện kinh doanh xây dựng" được ban hành kèm theo Quyết định số 27/2000/QĐ-BXD ngày 08-12-2000 của Bộ trưởng Bộ Xây dựng và chấp hành các qui định khác của pháp luật có liên quan đến xây dựng. 2. Đối với doanh nghiệp tư vấn xây dựng có hoạt động về thiết kế công trình xây dựng thì một trong số người đại diện cho pháp nhân doanh nghiệp và những người làm chủ trì thiết kế của doanh nghiệp phải đăng ký tại cơ quan có thẩm quyền để được cấp chứng chỉ hành nghề thiết kế công trình theo qui định của pháp luật tại "Qui chế cấp chứng chỉ hành nghề thiết kế công trình" được ban hành theo Quyết định số 23/2000/QĐ-BXD ngày 13-11-2000 của Bộ trưởng Bộ Xây dựng. -
Section III
1. Qui định chung 1.1. Các nhà thầu nước ngoài gồm thầu tư vấn xây dựng (bao gồm tư vấn về quản lý dự án xây dựng, khảo sát, thiết kế, thẩm tra thiết kế, kiểm định, quản lý chất lượng xây dựng và các công việc tư vấn xây dựng khác), và các nhà thầu xây dựng công trình (sau đây gọi chung là nhà thầu) khi nhận thầu thực hiện dự án xây dựng tại Việt Nam đều phải lập hồ sơ theo hướng dẫn tại Thông tư này để được cấp giấy phép thầu tư vấn xây dựng, hoặc giấy phép thầu xây dựng công trình. 1.2. Giấy phép thầu tư vấn xây dựng, giấy phép thầu xây dựng (gọi chung là giấy phép thầu) được cấp cho nhà thầu nước ngoài theo từng hợp đồng nhận thầu. Đối với hợp đồng thứ hai trở đi nếu phát sinh trong cùng năm thì thủ tục xin giấy phép thầu chỉ bao gồm đơn và tài liệu bổ sung khác so với hồ sơ đã có trước đó. 1.3. Giấy phép thầu cấp cho nhà thầu nước ngoài là chứng chỉ pháp lý để nhà thầu nước ngoài thực hiện hợp đồng tư vấn xây dựng, thực hiện xây lắp công trình tại Việt Nam, để quan hệ với các cơ quan Nhà nước Việt Nam trong việc thực hiện các qui định của pháp luật có liên quan tại Việt Nam. 1.4. Khi nhận giấy phép thầu, nhà thầu nước ngoài phải nộp khoản lệ phí theo qui định của Bộ Tài chính.2. Hồ sơ xin cấp giấy phép thầu xây dựng do nhà thầu nước ngoài nộp gồm 01 bộ gốc và 03 bộ sao (phôtô coppy); bộ gốc gồm có: 2.1. Đơn xin giấy phép thầu xây dựng công trình (theo mẫu tại phụ lục số 5) 2.2. Bản sao báo cáo quá trình đấu thầu, đánh giá và kết quả đấu thầu của chủ đầu tư và văn bản xác nhận kết quả đấu thầu của cơ quan có thẩm quyền hoặc quyết định chọn thầu hợp pháp của chủ đầu tư. 2.3. Bản sao giấy phép đầu tư dự án do cơ quan có thẩm quyền cấp hoặc quyết định đầu tư đối với công trình vốn Nhà nước hoặc giấy phép xây dựng đối với công trình không phải thuộc vốn Nhà nước. 2.4. Chứng chỉ pháp nhân của nhà thầu nước ngoài: Giấy phép thành lập và Điều lệ công ty (hoặc Giấy đăng ký kinh doanh) và chứng chỉ hành nghề của chính quốc cấp cho nhà thầu (bản sao có công chứng tại chính quốc hoặc được cơ quan ngoại giao có thẩm quyền của Việt nam hoặc chính quốc xác nhận). 2.5. Hợp đồng liên danh với nhà thầu Việt Nam hoặc bản cam kết sử dụng thầu phụ Việt Nam theo qui định của Qui chế Đấu thầu Việt Nam.3. Hồ sơ xin giấy phép thầu tư vấn xây dựng do nhà thầu nước ngoài nộp 01 bộ gốc và 03 bộ sao (phôtô coppy); bộ gốc gồm có: 3.1. Đơn xin giấy phép thầu tư vấn xây dựng (theo mẫu tại phụ lục số 5) 3.2. Bản sao báo cáo đánh giá và kết quả đấu thầu của chủ đầu tư; văn bản xác nhận kết quả đấu thầu của cơ quan có thẩm quyền; hoặc quyết định chọn thầu hợp pháp của chủ đầu tư. 3.3. Bản sao giấy phép đầu tư dự án do cơ quan có thẩm quyền cấp hoặc quyết định đầu tư đối với công trình vốn Nhà nước hoặc giấy phép xây dựng đối với công trình không thuộc vốn Nhà nước. 3.4. Chứng chỉ pháp nhân về tư vấn xây dựng của nhà thầu nước ngoài được cấp tại chính quốc (bản sao công chứng); bản kê khai kinh nghiệm thiết kế công trình.4. Tổ chức cấp giấy phép thầu: 4.1. Bộ Xây dựng xét cấp giấy phép thầu đối với các nhà thầu nước ngoài thực hiện các gói thầu thuộc dự án nhóm A về xây lắp từ 10 triệu USD hoặc tương đương trở lên và gói thầu về tư vấn xây dựng từ 1 triệu USD hoặc tương đương trở lên (công trình có vốn đầu tư nước ngoài hoặc công trình có vốn đầu tư trong nước); và các trường hợp không thuộc thẩm quyền cấp giấy phép thầu của Sở Xây dựng qui định điểm 5.2 dưới đây. 4.2. Sở Xây dựng cấp giấy phép thầu cho các nhà thầu nước ngoài thực hiện các gói thầu thuộc dự án nhóm B (công trình có vốn đầu tư nước ngoài) và nhóm B-C (công trình vốn đầu tư trong nước) tại địa bàn tỉnh và các gói thầu nhỏ của dự án nhóm A thấp hơn mức qui định tại điểm 4.1 trên đây. 4.3. Trong vòng 5 ngày làm việc kể từ ngày nhận hồ sơ xin giấy phép thầu, nếu thấy hồ sơ không đầy đủ hoặc không hợp lệ thì cơ quan cấp giấy phép yêu cầu nhà thầu bổ sung tài liệu. Việc xét và cấp giấy phép cho nhà thầu nước ngoài được thực hiện trong thời hạn 20 ngày làm việc kể từ ngày nhận đủ hồ sơ hợp lệ. Giấy phép thầu xây dựng và tư vấn xây dựng cấp cho nhà thầu nước ngoài thực hiện theo mẫu tại phụ lục số 65. Những việc nhà thầu nước ngoài phải thực hiện sau khi được cấp giấy phép thầu: 5.1. Đăng ký địa chỉ giao dịch, số điện thoại, số Fax tại Việt Nam và người đại diện hợp pháp với Uỷ ban nhân dân cấp tỉnh nơi có công trình và thông báo cho Bộ Xây dựng và Sở Xây dựng địa phương đó (và Ban quản lý KCN nếu công trình nằm trong KCN). Khi có sự thay đổi, phải đăng ký lại và thông báo như trên. 5.2. Chấp hành các qui định của pháp luật Việt Nam về quản lý đầu tư và xây dựng. 5.3. Thực hiện các qui định ghi trong giấy phép thầu, chấp hành các pháp luật khác của Việt Nam có liên quan đến hoạt động nhận thầu tại Việt nam. 5.4. Báo cáo định kỳ 6 tháng một lần và báo cáo khi kết thúc hợp đồng về việc hoạt động theo giấy phép thầu được cấp gửi về Bộ Xây dựng và Sở Xây dựng (theo mẫu tại phụ lục số 7).
-
Section IV
TỔ CHỨC KIỂM TRA VÀ THỰC HIỆN
1. Tổ chức kiểm tra: 1.1. Căn cứ vào trách nhiệm được phân cấp tại Thông tư này Bộ Xây dựng, Sở Xây dựng các tỉnh và thành phố tổ chức kiểm tra việc xây dựng các công trình có vốn đầu tư nước ngoài, hoạt động của doanh nghiệp có vốn đầu tư nước ngoài kinh doanh về xây dựng, tư vấn xây dựng và kiểm tra hoạt động của nhà thầu nước ngoài theo định kỳ một năm một lần. Khi tiến hành kiểm tra phải thông báo cho cơ quan cấp giấy phép đầu tư biết để phối hợp. Việc kiểm tra đột xuất được thực hiện khi phát hiện nhà thầu xây dựng có dấu hiệu vi phạm pháp luật về xây dựng, khi có khiếu nại của các bên có liên quan đến xây dựng công trình hoặc khi có sự cố công trình; cơ quan kiểm tra phải tiến hành kiểm tra, xử lý theo đúng thủ tục do pháp luật qui định. Chủ đầu tư và nhà thầu có trách nhiệm tạo điều kiện thuận lợi để các cơ quan kiểm tra thực hiện tốt chức năng của mình. 1.2. Nghiêm cấm mọi hoạt động kiểm tra tuỳ tiện không theo qui định tại điểm 1.1 trên và gây phiền hà cho quá trình xây dựng công trình. Mọi việc lợi dụng quyền lực kiểm tra gây phiền hà cho chủ đầu tư và nhà thầu đều bị xử lý nghiêm theo pháp luật. 1.3. Chậm nhất 10 ngày sau khi kết thúc việc kiểm tra, các cơ quan khi thực hiện thanh tra, kiểm tra phải lập văn bản báo cáo Bộ trưởng Bộ Xây dựng, Bộ trưởng Bộ kế hoạch và Đầu tư và Chủ tịch Uỷ ban nhân dân cấp tỉnh (nơi có công trình) để biết và xử lý khi cần thiết. 1.4. Định kỳ 6 tháng một lần Sở Xây dựng các tỉnh, thành phố báo cáo Bộ Xây dựng về việc cấp giấy phép thầu xây dựng, tình hình hoạt động và thực hiện việc xây dựng các công trình có vốn đầu tư nước ngoài tại địa phương theo mẫu phụ lục số 8.2. Tổ chức thực hiện: 2.1. Thông tư này có hiệu lực sau 15 ngày được ký ban hành và thay thế cho Thông tư số 01/BXD-CSXD ngày 15-4-1997, Thông tư số 03/1998/TT-BXD ngày 12-6-1998 của Bộ Xây dựng Hướng dẫn về quản lý xây dựng các công trình có vốn đầu tư trực tiếp của nước ngoài, nhà thầu nước ngoài nhận thầu xây dựng tại Việt Nam và thay thế cho Thông tư số 02/1998/TT-BXD ngày 29-4-1998 của Bộ Xây dựng Hướng dẫn về đăng ký hoạt động đối với các doanh nghiệp xây dựng, tư vấn xây dựng có vốn đầu tư trực tiếp của nước ngoài tại Việt Nam. 2.2. Các cơ quan Nhà nước có thẩm quyền tổ chức thực hiện theo qui định của Thông tư này; Trong quá trình thực hiện nếu có vướng mắc hoặc phát hiện có vấn đề cần thiết chưa được đề cập thì báo cáo Bộ Xây dựng để kịp thời nghiên cứu giải quyết./.
Basis for the status