Article 32
Decree 45/2001/NĐ-CP — Về hoạt động điện lực và sử dụng điện.
1. Under the conditions where the electricity grids meet the prescribed quality, the buyer of electricity for production, business or service activities with the use capacity of 80 kW or more or the transformer of 100 kVA or more, the cos j of ’ 0.85 must be ensured at the places where electricity meters are installed.
2. Where the cos j is <0.85, the electricity buyer must apply the following measures:
a) Installing the resistance capacity offsetting equipment to raise cos j to 0.85 or higher;
b) Buying more resitance capacity on the seller’s electricity system.
3. Where the electricity buyer can transmit the resistance capacity onto grids, the two parties may reach agreement on such purchase and sale in the contract. The Ministry of Industry and the Government Pricing Committee shall guide the purchase and sale of resistance capacity prescribed in Clauses 2 and 3 of this Article.
Article 32, Decree 45/2001/NĐ-CP