Article 22. Test operation before acceptance and evaluation of contracts
Decree 45/1998/NĐ-CP — Quy định chi tiết về chuyển giao công nghệ
1. The transferor and transferee shall have to make a report on the evaluation of the results of each stage of the technology transfer such as:
- Evaluation and test operation before acceptance: machinery and equipment (if there are machinery and equipment supplied by the transferor), (for machinery, equipment and supplies subject to strict requirements for labor safety, which must be registered and licensed for use before being put into official use), technologies already transferred before official production;
- Evaluation of the contract performance by the parties according to the technological contents determined in each stage of the contract;
- Evaluation of the results achieved at the end of the contract against the set objectives.
These reports shall be sent to the agency that has approved the contract within 15 days from the date the evaluation is completed.
2. During the term of a contract, annually the transferee shall have to report the technology transfer results according to the contract's contents to the agency that has approved the contract.
These reports shall also be sent to the Ministry of Science, Technology and Environment.
Article 22, Decree 45/1998/NĐ-CP