Article 2
Decision 773-TTg — Về Chương trình khai thác, sử dụng đất hoang hoá, bãi bồi ven sông, ven biển và mặt nước ở các vùng đồng bằng
The Program of tapping and utilizing waste land and alluvial soil on the river and sea shores, and water surfaces in the plains shall be carried out through projects. These projects must be built synchronously with the aim of developing the economy, shaping the economic structure in the direction of combining agriculture, forestry, fisheries and industry in accordance with the requirement for transforming the rural economic structure along the industrialization-modernization line, re-distributing the population (re-settlement), meet social requirements (in culture, education and health care), building a new, civilized and modern countryside, protecting and improving the general environment and ecology.
The implementation of projects to tap and utilize waste land, alluvial soil and water surfaces must be undertaken step by step in the direction of key planning in given periods, and in conformity with the investment ability of the people and the State. Priority shall b given to those projects which generate employment for many people, help re-settle many people from over-populated areas, the areas which produce a large quantity of commodities of high economic value, and the border areas and islands which play a key role in national security and defense.
Article 2, Decision 773-TTg