Article 5
Decision 58/2000/QĐ-BTC — Về việc ban hành biểu mức thu lệ phí kiểm định kỹ thuật và lệ phí cấp giấy phép sử dụng các máy móc, thiết bị, vật tư và các chất có yêu cầu nghiêm ngặt về an toàn
Organizations and individuals being fee payers; units organizing the collection of fees for technical expertise and issuance of permits for the use of machinery, equipment, supplies and substances subject to strict safety requirements and the relevant agencies shall have to implement this Decision.
For the Minister of Finance
Vice Minister
PHAM VAN TRONG
TABLE OF FEE LEVELS FOR TECHNICAL EXPERTISE AND ISSUANCE OF PERMITS FOR THE USE OF MACHINERY, EQUIPMENT, SUPPLIES AND SUBSTANCES SUBJECT TO STRICT SAFETY REQUIREMENTS
(Issued together with the Finance Minister’s Decision No.58/2000/QD-BTC of April 21, 2000)
I. TABLE OF TECHNICAL SAFETY EXPERTISE FEE LEVELS:
Ordinal number
Names of equipment
Calculation units
Capacity, volume, tonnage
Collection level each time (VND)
01
Steam boilers
Unit/expertise
Under 0.5 T/h
300,000
Ditto
From 0.5 T/h to 1 T/h
500,000
Ditto
From over 1 T/h to 2 T/h
1,000,000
Ditto
From over 2 T/h to 4 T/h
1,500,000
Ditto
From over 4 T/h to 6 T/h
1,800,000
Ditto
From over 6 T/h to 10 T/h
2,200,000
Ditto
From over 10 T/h to 25 T/h
4,000,000
Ditto
From over 25 T/h to 75 T/h
6,000,000
Ditto
From over 75 T/h to 125 T/h
8,000,000
Ditto
From over 125 T/h to 200 T/h
13,000,000
Ditto
From over 200 T/h to 400 T/h
18,000,000
Ditto
Over 400 T/h
22,000,000
02
Pressure tanks
Tank/expertise
Under 1m3
150,000
Ditto
From over 1m3 to 2m3
300,000
Ditto
From over 2m3 to 5m3
400,000
Ditto
From over 5m3 to 10m3
600,000
Ditto
From over 10m3 to 25m3
800,000
Ditto
From over 25m3 to 50m3
1,000,000
Ditto
From over 50m3 to 100m3
2,500,000
Ditto
From over 100m3 to 500m3
4,000,000
Ditto
Over 500m3
6,000,000
03
Gas cylinders
Cylinder/expertise
Standard cylinders
60,000
Ditto
Non-standard cylinders
80,000
04
Cooling system
System/expertise
Ditto
Under 30,000 Kcal/h
1,000,000
Ditto
From 30,000 Kcal/h to 50,000 Kcal/h
1,500,000
Ditto
From over 50,000 Kcal/h to 100,000 Kcal/h
2,000,000
Ditto
From over 100,000 Kcal/h to 250,000 Kcal/h
2,500,000
Ditto
From over 250,000 Kcal/h to 1,000,000 Kcal/h
3,000,000
Ditto
Over 1,000,000 Kcal/h
4,000,000
05
Gas-regulating and feeding system
System/expertise
Ditto
System with 20 feeding mouths or less
2,000,000
Ditto
System with 21 feeding mouths or more
3,000,000
06
Pipe-lines of all types (excluding solvents)
Meter/expertise
Ditto
With a diameter equal to or smaller than 150 mm
10,000
Ditto
With a diameter of over 150 mm
15,000
07
Escalators (irrespective of their capacities)
Unit/expertise
2,000,000
08
Elevators
Unit/expertise
For under 10 stories
1,500,000
Ditto
For 10 stories or more
2,500,000
09
Mechanical lifts
Unit/expertise
Ditto
Under 1 ton
500,000
Ditto
From 1 ton to 3 tons
600,000
Ditto
From over 3 tons to 5 tons
800,000
Ditto
From over 5 tons to 7.5 tons
1,000,000
Ditto
From over 7.5 tons to 10 tons
1,500,000
Ditto
From over 10 tons to 15 tons
1,700,000
Ditto
From over 15 tons to 20 tons
2,000,000
Ditto
From over 20 tons to 30 tons
2,500,000
Ditto
From over 30 tons to 50 tons
3,000,000
Ditto
From over 50 tons to 75 tons
3,500,000
Ditto
From over 75 tons to 100 tons
4,000,000
Ditto
Over 100 tons
6,000,000
II. USE PERMIT-ISSUING FEE LEVEL:
The permit-issuing fee level for the use of machinery, equipment, supplies and substances subject to strict safety requirements is 40,000 VND/permit.-
Article 5, Decision 58/2000/QĐ-BTC