Article 4. On development of infrastructure
Decision 173/2001/QĐ-TTg — Về phát triển kinh tế - xã hội vùng đồng bằng sông Cửu Long giai đoạn 2001 - 2005
To continue strongly developing infrastructure with a view to creating conditions for rapid socio-economic development in the region.
The plannings on communications, construction, population clusters and lines and dwelling houses, electricity, water’ must be further supplemented and revised to suit the irrigation and flood control plannings so as to meet the flood drainage requirements, and at the same time to ensure safety for infrastructural works when floods occur every year.
1. Regarding irrigation: To invest in building systems of irrigation works in association with the communications development and construction of population clusters, lines and centers according to Decision No. 99/TTg of February 9, 1996 in order to serve effectively the production restructuring and people’s life.
On the basis of the 2000 and 2001 figures on floods, to assign the Ministry of Agriculture and Rural Development to assume the prime responsibility and coordinate with the concerned ministries and branches and the provincial People’s Committees in supplementing and finalizing the overall planning on irrigation and flood drainage systems, acidity and alum neutralization, salinization prevention, freshwater containment’ to meet the requirements of the region’s economic restructuring program; supplementing and revising the flood control planning on the basis of calculating the 2000 flood reversion in the whole Mekong river basin, making it suitable to the flood development and newly-arising issues, thereby ensuring the requirements of rapid and sustainable socio-economic development in the region.
a/ Regarding the objectives for 2005, to perfect the system of key irrigation and flood control projects in the region in order to better meet the production requirements, minimize flood consequences, ensure safety for the people’s lives and properties as well as economic establishments and infrastructure.
To continue implementing and perfecting the irrigation system, combining water supply and drainage, alum neutralization, salinization prevention with flood control in the Long Xuyen Quadrangle. To speed up research so as to have scientific grounds for investment in building irrigation and flood control works in the Plain of Reeds and the Vam Co river area.
b/ To complete the construction items under the World Bank-funded project, including Quan Lo - Phung Hiep, Nam Mang Thit and Omon - Xa No; the Ba Lai irrigation project in Ben Tre province’;to build a synchronous intra-field irrigation system capable of controlling the water supply and drainage for the areas of around one million hectares planned for production of rice for export; to build a synchronous and complete irrigation system in service of around 700,000 hectares for rearing shrimps and assorted aquatic species.
To operate the irrigation systems in the western Hau river area, southern Ca Mau peninsula’ U Minh Thuong and U Minh Ha areas in order to meet the requirements of diversified production development.
To revise and finalize the planning on sea and river-mouth dykes in the coastal provinces with a view to facilitating the production restructuring, safeguarding people and draining flood water in the region.
2. Regarding communications and transport:
a/ Over the five coming years, to solve basically traffic problems, with attention paid to both land-road traffic and exploitation of the strengths of waterway traffic in the region; to upgrade and solidify national and provincial roads, of which 90% shall be asphalted; to open new roads N1 and N2 in parallel with the North-South national highway 1A, to open the Quan Lo - Phung Hiep route and the southern Hau river route (91c).
b/ To upgrade the systems of national highways, provincial roads and key district roads in order to formulate a smooth land road traffic system throughout the flooded region of the Mekong river delta.
The construction of communications lines, bridge and culvert systems must be closely coordinated with irrigation projects, thus forming a synchronous system for flood control, exploitation of water resources, protection of the sustainable environment, and construction of population clusters, lines and centers.
c/ For the immediate future, to concentrate on completing key projects, renovating and upgrading a number of communications lines and main ports; to make concentrated investment so as to achieve practical efficiency, creating a driving force in timely service of circulation, export and production development in the region, consolidating the security and defense posture.
To begin the construction of route N2, the Thanh Hoa - Duc Hoa section, route N1, the Ben Thuy - Tinh Bien - Ha Tien section, the southern Hau river route (91c), and the Quan Lo - Phung Hiep route.
To open national highway 1A at the Ho Chi Minh city - Trung Luong section, national highway 60 (Ben Tre - Tra Vinh, Soc Trang and two ferries of Co Chien and Dai Ngai); national highway 80 (the My Thuan - Vam Cong section); national highway 50 (the Cau Nhi Thien Duong - Go Cong - My Tho section), To Chau bridge on national highway 80 and a number of roads linking to the border gates; to deploy the construction of Can Tho bridge; to restore national highway 1 at the Ca Mau - Nam Can section.
To deploy the projects to build an expressway from Ho Chi Minh City to Can Tho (stage 1), Rach Mieu and Vam Cong bridges in the BOT form.
d/ To continue constructing inter-district, inter-commune and inter-village rural road networks with the funding sources: budgetary capital, capital mobilized from the population, capital provided by JBIC, ADB and WB donors; to complete soon the program on elimination of foot bridges and building of new rural bridges; to strive for all communes to have motorways leading to their centers by 2005.
e/ To make investment in order to basically complete the construction of traffic roads on islands (mainly on Phu Quoc island), aiming to ensure defense and security, at the same time settle matters related to electricity and water supply, bridges and culverts, health, education’ in order to raise the people’s living standards and develop production.
f/ To upgrade river ports located along the main communications line: Vinh Long port, Cao Lanh port on Tien river; My Thoi port on Hau river, Ca Mau river port, My Tho port (Tien Giang), Dai Ngai port; to raise the span of the First of January bridge in Soc Trang, Vinh Thuan bridge, to upgrade Sa Dec bridge, to build Thoi Binh bridge.
To complete the projects on two southern waterway routes and Can Tho port; to continue upgrading Can Tho port, stage 2, including completion of the remaining 76 meters of pier, building of yard roads and furbishment of loading and unloading equipment. To invest in building Cai Cui port (Can Tho), Can Giuoc port (Long An) and Dinh An port (Tra Vinh).
The Ministry of Communications and Transport shall closely coordinate with the Ministry of Agriculture and Rural Development in calculating and determining the span width and positions of the bridges along the traffic roads and the systems of axis irrigation canals, to work out appropriate construction solutions (over-the-flood bridges, viaducts, floodways’) so as to both ensure traffic and avoid affecting the flow and raising the flood level.
3. On the plan for building population clusters and lines and dwelling houses in frequently-flooded areas.
a/ To build over-the-flood population clusters and lines (taking the peaks of the 1961 and 2000 floods as standard).
For the construction of population clusters and lines, public welfare facilities such as schools, health centers’, it must ensure that they shall not be inundated as in 1961 and 2000, inhabitants in flood-prone areas shall have a safe and stable life, not have to evacuate when floods occur; at the same time create favorable conditions for production development, suit the living conditions and habits of the people in the region, help the people in the whole region to lead a civilized and modern life, meet the requirements of agricultural industrialization and modernization and rural development.
The population lines and clusters and dwelling houses shall be constructed according to planning, by methods of elevating house bases, building protection dykes or building house floors on piles, ensuring safety in the flood season and compliance with the plannings which are approved by the provincial People’s Committees after obtaining the evaluation opinions of the Ministry of Construction.
To build public welfare facilities (education, health, cultural and social’) which can operate normally in the flood season.
b/ To supplement and finalize the construction planning, to arrange population in clusters and lines; protection dykes surrounding population quarters shall be associated with socio-economic infrastructures in service of the people’s life; for the immediate future deeply-submerged areas shall be given priority.
- For populous provincial towns, district townships and suburban centers: To combine the elevation of their bases and the building of protection dykes surrounding population quarters with solutions to water drainage, environmental sanitation and construction of urgent essential public welfare facilities, suited to the practical conditions of each locality.
- For commune center clusters, consisting of commune’s headquarters, schools, health stations, dwelling houses’ to apply mainly the solution of raising their bases to an over-the-flood level on an appropriate scale of between 3 and 5 ha; for each population cluster, around two to three ha may be arranged for 100 to 120 households, in association with rice fields and compatibility with living and production conditions of the people and the location of public welfare facilities.
- Population lines shall be built mainly along axis canals, grade I - canals and major traffic roads. Population clusters shall be arranged along population lines. Population clusters may be arranged along one side or both sides of such canals or roads, interruptedly or successively along each line, suited to the flood drainage planning and concrete conditions of each area.
- For large surrounding dykes to protect people’s production and daily-life activities on a village, commune or district scale, detailed plannings must be worked out so as to avoid spontaneous widespread construction thereof which serves sectional interests at the expense of common interests. The Ministry of Agriculture and Rural Development must consider and approve detailed plannings for each province on the basis of the whole region’s irrigation and flood control plannings.
c/ In the 2001-2005 five-year plan, to concentrate investment so as to basically complete the construction of population lines and clusters and essential infrastructure in flood-prone, river-mouth and coastal areas; to ensure that schools, hospitals, medical and cultural establishments’ operate normally in the flood season, step by step solidify them to avoid inundation.
Within two years 2001 and 2002, to complete the formulation of detailed plannings on the construction of commune centers and population clusters in the flood-prone areas; to concentrate on directing the simultaneous completion of five pilot population clusters in flood-prone areas, which are now being invested incompletely, to sum up and draw experiences for wide application. By 2005 the construction of over-the-flood population lines and clusters must be completed.
The Ministry of Construction shall assume the prime responsibility for formulating, together with the provinces, programs and plans on the construction of safe population clusters and lines in flood-prone areas and the 2001-2005 five-year program on housing development in the Mekong river delta region, submit them to the Prime Minister for approval and direction of the program implementation.
d/ To implement appropriate housing support policies for policy beneficiary families, poor inhabitants, especially households of Khmer people who are leading a difficult life and unable to build their houses. The Ministry of Labor, War Invalids and Social Affairs shall assume the prime responsibility and coordinate with the concerned ministries and branches in formulating specific support policies and submit them to the Prime Minister in the fourth quarter of 2001.
Together with the State’s support policies, the localities and people in the region shall launch campaigns to help people solve problems regarding land and dwelling house construction with a view to stabilizing their life.
e/ To review and adjust the plannings of population areas, district townships and suburban centers, well combining the embellishment, upgrading and expansion of old urban centers with the investment in building new ones; to upgrade and renovate infrastructures in district townships and suburban centers in the region; to coordinate with the localities in directing the effective implementation of support policies and creating conditions for improving the people’s dwelling houses, particularly for inhabitants in flood-prone areas.
f/ The State encourages the localities to mobilize resources and organize the effective implementation of the program on investment in development of rural infrastructure such as investment in rural traffic roads, aquaculture infrastructures, rural craft village infrastructure’; to ensure clean water and environmental sanitation in rural areas; to well deal with the environment in industrial parks, population quarters, rivers and canals.
Article 4, Decision 173/2001/QĐ-TTg