Article 2. Organization of implementation
Decision 164/2002/QĐ-TTg — Về việc phê duyệt Quy hoạch điều chỉnh phát triển công nghiệp xi măng Việt Nam đến năm 2010 và định hướng đến năm 2020
1. The Ministry of Construction shall have to:
- Manage and direct the implementation of this adjusted planning; coordinate with the concerned ministries in studying and perfecting mechanisms and policies, and seeking measures to accelerate the tempo of investment in cement projects in order to overcome the cement shortage by 2005 and afterwards. In the course of implementation direction, any matters rising beyond its competence must be reported to the Prime Minister for consideration and decision.
- Base itself on the country’s economic development situation in each period to propose to the Prime Minister contents which need to be adjusted to make the planning suit the practical situation.
- Assume the prime responsibility and coordinate with the Ministry of Industry in working out a program on and directing the domestic manufacture of equipment, machinery and components to substitute for imported ones, and at the same time assume the prime responsibility and coordinate with the Ministry of Planning and Investment and the Ministry of Finance in studying policies to support domestic units to use, and take part in the manufacture of, equipment, accessories, materials and raw materials for Vietnam’s cement industry.
2. The Ministry of Natural Resources and Environment shall coordinate with the Ministry of Construction in planning, surveying, exploring and measuring reserves of raw materials for cement production in a complete and accurate manner, in timely service of the elaboration of long-term and short-term development plans of the cement industry.
3. The Ministry of Finance, the Ministry of Planning and Investment and the State Bank of Vietnam shall jointly study support policies and seek forms of mobilizing investment capital sources for the cement industry’s projects.
4. The Ministry of Communications and Transport shall assume the prime responsibility and coordinate with the Ministry of Construction in working out plans for communications and transport development in a synchronous manner to serve the cement industry, such as: specialized transport means and non-specialized transport means, loading-unloading equipment, the system of river ports and seaports, the system of railroads and land roads, the planning on construction locations of the system of cement - clinker silos and storage, special-use conveyor belts at ports.
5. The Ministry of Education and Training shall assume the prime responsibility and coordinate with the Ministry of Construction and the Ministry of Labor, War Invalids and Social Affairs in working out plans on and directing the organization of postgraduate training of officials, training of engineers and skilled workers to meet the cement industry’s development requirements in three forms of new-recruit training, advanced level training and re-training.
6. The Ministry of Science, Technology and Environment and the Ministry of Construction shall devise plans to step up scientific, technical and technological activities in the cement industry along the direction of absorbing and applying the world’s technological and technical advances, raising the consultation capability in the domains of project management and execution, technology research, development and transfer, and market expansion.
7. Vietnam Cement Corporation shall be built into a strong economic conglomerate, which is equipped with modern production technologies, turns out high-quality products, exports a portion of its cement products and plays the key role in supplying cement and stabilizing the domestic cement market.
Article 2, Decision 164/2002/QĐ-TTg