Article 12
Decree 98/CP — Quy định việc thi hành Pháp lệnh Khai thác và bảo vệ công trình thuỷ lợi
The company exploiting a hydraulic work (or the investor of its construction) shall draw up the plan for utilization of the land within the protection area of the hydraulic work and submit it to the People's committee of the province or city directly under the Central Government and the Ministry of Agriculture and Rural Development for approval. The plan for land use must ensure these requirements:
1. It must afford passageways for survey and monitoring and a level ground to handle incidents, if any;
2. For a canal it must have a level ground for the deposition of mud and sand, a drainage ditch for dredging and for fillings to regularly strengthen the canal wall and repair it whenever a break or landslide occurs. For am irrigation-cum-drainage canal, it must ensure the requirements of both the irrigation canal and the drainage canal.
3. For a water reservoir it must ensure safety for the population living around the reservoir during the flood season; the cultivation of crops and the exploitation of natural resources must not cause erosion or sedimentation at the reservoir bed.
Article 12, Decree 98/CP