Article 42
Decree 68-CP — Quy định chi tiết việc thi hành Luật khoáng sản
1. The Ministry of Industry shall evaluate the project on mineral survey or prospection before deciding to grant permit for survey or prospection.
2. The evaluation of a project comprises the following:
- Location, boundary and area;
- Geological foundations and the objectives of the survey and prospection (the kind of mineral, quantity, extent of the study);
- Technique and technology;
- Impact on the environment and ecology, on the natural resources, constructions and other properties;
- Duration and tempo of operation;
- Estimated cost.
3. The Minister of Industry shall base himself/herself on the evaluation result to ratify the projects on survey and prospection partially or wholly funded by State capital.
4. With regard to the projects which do not use State capital, the contents of the ratification of the project are stated in the permit for survey and the permit for prospection.
Article 42, Decree 68-CP