Article 28. Rights and obligations of the equipment provision principal
Decree 48/2010/NĐ-CP — Về hợp đồng trong hoạt động xây dựng
1. To provide necessary information and documents and ground areas for equipment installation to the contractor.
2. To coordinate with the contractor in training, transferring technologies and providing instructions on installation, use and operation.
3. To refuse to conduct takeover test and receive technological equipment handed over not according to the agreements on quantity, quality, category and origin.
4. To take full responsibility for the quality of and intellectual property rights to technological designs it provides to the contractor.
5. Other rights and obligations provided by law.
Article 28, Decree 48/2010/NĐ-CP