Article 10. Construction contract dossiers
Decree 48/2010/NĐ-CP — Về hợp đồng trong hoạt động xây dựng
1. A construction contract dossier comprises a written construction contract and its accompanying documents.
2. A contract must contain the following principal details: jobs and work volumes to be performed: quality and technical requirements: performance duration and schedule: takeover and handover conditions: contract price, advance, payment and settlement and payment method: warranty duration (for construction contracts involving works for which warranty is required): rights and obligations of contracting parties: liability for contract breaches: language used in the contract: and other agreements depending on each type of contract.
3. Documents accompanying a construction contract constitute an integral part of the contract. Depending on the scale, nature and scope of jobs and specific type of construction contract, documents accompanying a construction contract may include:
a) Notice of contract winning or contractor appointment document or written approval of contractor appointment:
b) Particular conditions and terms of reference:
c) General conditions:
d) Bidding dossier or dossier of requirements of the principal:
e) Design drawings and technical instructions;
f) Bid dossier or dossier of proposal of the contractor:
g) Contract negotiation minutes, and written amendments and supplements thereto;
h) Contract annexes;
i) Other relevant documents.
4. The contracting parties shall reach agreement on priority order for the application of documents accompanying the contract to settling contradictory issues (if any).
Article 10, Decree 48/2010/NĐ-CP