Article 19
Decree 45/2001/NĐ-CP — Về hoạt động điện lực và sử dụng điện.
1. Independent electricity grids are allowed to be put into operation when satisfying the following conditions:
a) Being constructed strictly according to the approved designeds;
b) Being inspected and tested before acceptance as provided for by law;
c) Having electricity activity permits and other permits as prescribed by law.
2. In case of connecting to the national electricity system, there must be agreement on connection points and the electricity trading contracts must be signed with Vietnam Electricity Corporation.
Article 19, Decree 45/2001/NĐ-CP