Article 15. Requirements on working designs of urban underground works
Decree 41/2007/NĐ-CP — Về xây dựng ngầm đô thị
1. The working designs of underground works must comply with urban construction plannings.
2. The working designs of underground works must suit the geo-technical and hydro-geological conditions and their possible changes.
3. The working designs of underground works must be synchronous and in proper connection with the architectural groups of adjacent and aboveground works and the common technical infrastructure systems of urban centers; ensure safety, without affecting adjacent or aboveground construction works; combine with defense or security requirements when necessary; and at the same time must work out solutions to the preservation of greenery, the protection of historical or cultural relics in the construction areas (if any).
4. The designs of architectural space inside underground works must, apart from the requirements on their utility and durability, satisfy the requirements on landscape and suitability to the cultural and historical characteristics of the work construction areas.
5. The designs of lighting, air conditioning, ventilating, fire prevention and fighting and exit systems as well as the operation control systems inside underground works must be compatible with the type and grade of works as provided for by the construction law.
6. The working designs of underground works must satisfy the anti-permeation, anti-corrosion and anti-erosion requirements.
7. The designs of underground works must ensure convenience for disabled people, ensure safety and quick exit upon the occurrence of incidents.
8. The designs of underground works must describe the processes for operation and maintenance of works.
9. The working designs of underground works must set the tasks of geo-technical observation.
10. Underground work construction designing contractors must give instructions and facilitate the construction according to design drawings, and concurrently perform the task of authorship supervision throughout the process of construction in order to handle disparities between practical construction and design blueprints.
Article 15, Decree 41/2007/NĐ-CP