Article 2. Construction of high-voltage power grid works
Decree 106/2005/NĐ-CP — Quy định chi tiết và hướng dẫn thi hành một số điều của Luật Điện lực về bảo vệ an toàn công trình lưới điện cao áp
1. Within 15 days after construction grounds of high-voltage power grid projects are approved by competent state agencies, investors shall have to notify such in writing to local People's Committees, organizations, households and individuals being land users or owners of houses, construction works and other assets located within corridors of such high-voltage power grid works. The compensation and supports for land, assets on land and other supports to current land users upon construction of works shall comply with the provisions of law on compensation, support and resettlement. All assets and works created after receipt of notices on execution of projects and encroaching upon safety corridors according to the provisions of this Decree must be dismantled without any compensation or support.
2. Investors of high-voltage power grid works must abide by the provisions of Clauses 2 and 3, Article 49 of the Electricity Law and the provisions of construction law.
In cases where it is necessary to construct overhead power transmission lines over works of political, economic, cultural, security, defense, information and communication importance, places of frequent mass gatherings, historical-cultural relics, scenic places and landscapes which have been classified by the State, the following conditions must be satisfied:
a/ Overhead power transmission line sections stretching over above-said works and places must be reinforced with power and construction safety measures;
b/ The distance from the lowest point of the power transmission line in the maximum sagging state to the natural ground surface must not be shorter than the following:
Voltage
Up to 35 kV
Between 66-110 kV
220 kV
Distance
11 m
12 m
13 m
3. Underground cable sections connected with overhead power transmission lines at a height of 2 meters from the ground surface must be placed in protection tubes.
4. Upon completion of construction of high-voltage power grid works, work investors shall have to promptly notify such to provincial/municipal People's Committees of localities where exist such high-voltage power grid works for coordinated management.
Article 2, Decree 106/2005/NĐ-CP