Article 29. Bid-evaluation methods
Law 61/2005/QH11 — Luật Đấu thầu số 61/2005/QH11
1. Bid-evaluation methods must be reflected through evaluation criteria in bidding dossiers. Bid-evaluation criteria shall cover criteria for evaluation of capabilities and experiences in cases where the pre-qualification is not applied; criteria for general evaluation of consultancy service-bidding packages or contents for determination of expenses on the same technical, financial and commercial grounds for comparing and ranking bids, with regard to procurement, construction and installation or EPC bidding packages.
2. With regard to consultancy service-bidding package, the point-rating method shall apply to technical evaluation. Upon formulation of evaluation criteria, the minimum technical requirements must be specified but not lower than 70% of the total technical points, or not lower than 80%, for bidding packages with high technical requirements. The formulation of evaluation criteria for comparing and ranking bids shall comply with the following provisions:
a/ For consultancy service-bidding packages without high technical requirements, a general point scale shall be used to rank bids. The general point scale must ensure the principle that technical points shall not be lower than 70% of the total points of the scale. The bid of the contractor with the highest point shall be ranked first;
b/ For consultancy service-bidding packages with high technical requirements, the contractor whose bid has the highest technical point shall be ranked first for consideration of financial proposals.
3. For procurement, construction and installation or EPC bidding packages, the point-rating method or method of evaluation by the "pass" or "fail" criterion shall apply to technical evaluation. Upon formulation of technical evaluation criteria through a point scale, the minimum technical requirements must be specified but not lower than 70% of the total technical points or not lower than 80%, for bidding packages with high technical requirements. For bids which have passed the technical evaluation, the expenses on the same technical, financial and commercial grounds shall be used for comparing and ranking bids. Bids of contractors with the lowest expenses on the same grounds shall be ranked first.
The Government shall specify the evaluation of bids.
Article 29, Law 61/2005/QH11