Article 51. Overhead electricity transmission line safety protection
Law 28/2004/QH11 — Luật Điện lực số 28/2004/QH11
1. Owners or users of dwelling houses or works, which are allowed to exist in the overhead electricity transmission line safety protection corridors must not use the roofs or any parts of such dwelling houses or works for purposes, which may encroach upon the electricity discharge safety distance according to the voltage grades and must comply with the regulations on protection of overhead electricity transmission line safety when repairing, renovating the dwelling houses or works.
2. Before granting permits to organizations or individuals for construction, expansion or renovation of dwelling houses or works in the overhead electricity transmission line safety protection corridors, the permit-granting agencies must request the investing owners of such dwelling houses or works to agree in writing with the high-voltage electricity grid-managing units on measures to protect the safety of the overhead electricity transmission lines and the safety in the course of construction, expansion, renovation and use of such dwelling houses or works.
3. Dwelling houses and works where people regularly live or work must not be allowed to exist in the safety protection corridors of the overhead electricity transmission lines of 500 kV or higher, except for specialized works in service of operation of such electricity grids.
4. All activities, if involving the use of equipment, instruments or means which may encroach upon the electricity discharge safety distance according to voltage grade, shall be banned from being carried out in overhead electricity transmission line protection corridors. In special cases where it is due to urgent defense or security requirements, agreement must be reached with the electricity grid- managing units on necessary safety protection measures.
5. At a cross-section between an overhead electricity transmission line and a land road or railway, the minimum height of the electricity transmission line at the lowest point when the line is in the state of maximum sagging is 4.5 meters plus the voltage-based electricity discharge safety distance.
Where the highest points on the transport means are higher than the 4.5 meter-height, the means owners must contact the high-voltage electricity grid-managing unit for application of necessary safety measures.
6. At a cross-section between an overhead electricity transmission line and a railway reserved for electric trams, the minimum height of the transmission line at the lowest point when the line is in the state of maximum sagging is 7.5 meters plus the voltage-based electricity discharge safety distance.
7. At a cross-section between an overhead electricity transmission line and an inland waterway, the minimum height of the electricity transmission line at the lowest point when the transmission line is in the state of maximum sagging is equal to the overhead clearance height according to technical grade of the inland waterway plus the voltage-based electricity-discharge safety distance. The waterway transport means, when traveling through cross-sections between overhead electricity transmission lines and inland waterways must ensure that their heights shall not exceed the overhead clearance heights according to technical grades of such inland waterways.
The safety distance of the overhead electricity transmission lines cutting across sea routes shall be specified for each specific case.
8. When carrying out activities on land or underground near or in the overhead electricity transmission line safety protection corridors, which may affect the normal operation of the transmission lines or threaten to cause electric incidents or accidents, the units carrying out such activities must reach agreement with the electricity work-managing units on necessary safety protection measures.
Article 51, Law 28/2004/QH11