Mục 6
Bản dịch văn bản 409/2002/QD-TTg — Decision 409/2002/QD-TTg
Planning orientations for technical infrastructure development:
a/ On communications:
- Land roads:
+ To renovate and upgrade national highway No. 20 from Da Lat to Ho Chi Minh City, renovate and expand the road section from Lien Khuong airport to Prenn pass with four motor lanes. To restore one section of the old national highway No. 20B, from Prenn waterfall to Da Lat. To renovate and put to use provincial road 723, linking Da Lat city directly to Nha Trang city. To renovate and upgrade provincial road 722 from Da Lat to Dak Lak. To renovate and upgrade provincial road 725, connecting Da Lat, Ta Nung, Nam Ban, national highway 27 and national highway 27B. To renovate and perfect the inter- and intra-provincial car terminals. To build the Cam Ly route linking to Dan Kia- Suoi Vang tourist site.
+ The inner city�s traffic: shall cover a length of 185 km, of which 163.8 km shall be renovated and upgraded, and 21.2 km shall be built strictly based on the natural terrain in the radial form. To renovate, upgrade and build new roads leading to the tourist and convalescence sites, the technical infrastructure of Dan Kia, Suoi Vang and Tuyen Lam tourist resorts and the system of inner city�s car parks.
- Railways:
+ To build and restore the Da Lat- Phan Rang railway, linking to the national railway system.
+ To upgrade Da Lat railway station and other stations on the routes in service of passenger and cargo transportation, linking to the national railway system.
- Airways:
+ To upgrade the existing Lien Khuong airport into an international one.
+ To exploit and upgrade Cam Ly airport into a high-grade airport to be used exclusively for small special planes, helicopters and some types of sport and tourist aircraft.
- Organization of traffic:
+ To organize a belt route linking external traffic axes along the East-West direction (national highways No. 20 and No. 27 to Phan Rang; provincial road 725 to Ta Nung, linking to national highway No. 27) and North-South direction (provincial road 723 to Nha Trang; and national highway No. 20 to Ho Chi Minh City).
+ To organize mass transit routes and diversified forms of special-use traffic in service of visitors to scenic places in Da Lat and adjacent areas such as stagecoaches, trams, taxis or overpasses for pedestrians.
+ The telepheric route from Dan Kia lake to the top of Lang Bian mountain and from the access gate of Da Lat city to Tuyen Lam lake.
+ The monorail route around the central area in service of mass transit cum tourism.
+ To organize a system of parking lots in service of the municipal traffic, especially in the concentrated construction sites, trade centers, squares and the downtown.
b/ On land technical preparations:
- Ground leveling: To keep the natural terrain intact as much as possible, avoiding large-scale digging and embankment.
- To ensure that the newly-built roads stick fast to the landline, only to conduct sectional ground leveling for the creation of a road surface with slope.
- To restore and dig some more lakes in order to create landscape such as Me Linh lake, Van Kiep lake, Da Thien lakes No. 1, 2 and 3; to build Cam Ly lakes No.1, 2, 3 and 4 as well as Truong Son, Xuan Son and Tram Hanh lakes.
c/ On electricity supply:
- The supply source: shall be the national electric power grid and local electric power stations. To build 110 KV power-lines and Da Lat 1, Da Lat 2 and Suoi Vang 110/22 KV transformer stations.
- To renovate and develop the power distribution network to meet the city�s socio-economic development demand.
d/ On water supply:
- The water source to be supplied to inner city shall be the surface water source of Dan Kia and Chien Thang lakes.
- The water source to be supplied to suburban area shall be the reservoirs for water treatment.
- The daily-life water supply norm: 150 liters/person/day and 300 liters/tourist/day.
e/ On communication, post and telecommunications:
- To modernize the communication network, perfect the regional post-office network with a service radius of between 1.5 and 2 km for each post office, and public telephone network, develop post and telecommunications services.
- To modernize the radio and television broadcasting system, broaden the coverage.
d/ On waste water discharge and environmental hygiene:
- To build a new waste water- discharge and treatment system in the inner city. The waste water in suburban and adjacent areas shall be treated on the spot with septic tanks.
- Projected location for the construction of biological lakes: to adjust the lakes into the landscape lakes and preliminarily clean water before it run through Cam Ly waterfall.
- To locate slaughter-houses concentratedly to the downstream of Cam Ly waterfall so as to ensure the environmental hygiene and facilitate waste treatment.
- Management of solid wastes:
+ The existing garbage dump in Buon Bi hamlet occupies an area of 10 ha and may be expanded; to reserve a land fund for dumps with an area of around 50 ha, including the garbage-treatment sites in Dan Kia- Suoi Vang and Tuyen Lam lake- tourist resorts. To build a garbage- treating factory.
+ To work out plan for the relocation of the nuclear reactor and nuclear waste to suitable places, at least 20 km far away from the city and population quarters, and compatible with the national atomic energy development strategy.
- Cemeteries:
+ To continue using the 8 existing cemeteries. To stop the burial in the other graveyards, which shall be relocated step by step according to drawing plans; the Ma Thanh cemetery shall be cleared for the building of a sport and cultural park.
+ To build a new cemetery in Buon Bi hamlet and a crematory in Du Sinh zone, ward 5.
Mục 6 Bản dịch văn bản 409/2002/QD-TTg